Strack partnered with Alston Construction to provide site delivery services for Panettoni Development. The first stage of the project involved clearing and installing erosion control systems for 75 acres of land in Fairburn, Georgia. Once the site was cleared, Strack teams graded more than 667,000 CY of earth material, then installed a 600,000 SF building pad, more than $900,000 of storm drain infrastructure, and more than $1Million in site utilities.
Additionally, Strack installed modular walls throughout the site and coordinated with GADOT for widening of existing roadways and turn lanes. Despite the challenges of off-site utility coordination and tie-ins, our teams successfully completed the project on time and within budget for our client.
Strack se asoció con Alston Construction para proporcionar servicios de entrega en el sitio para Panettoni Development. La primera etapa del proyecto consistió en limpiar e instalar sistemas de control de erosión para 75 acres de tierra en Fairburn, Georgia. Una vez que se despejó el sitio, los equipos de Strack calificaron más de 667,000 CY de material de tierra, luego instalaron una plataforma de construcción de 600,000 SF, más de $ 900,000 de infraestructura de drenaje pluvial y más de $ 1 millón en servicios públicos del sitio.
Además, Strack instaló muros modulares en todo el sitio y coordinó con GADOT la ampliación de las carreteras existentes y los carriles de giro. A pesar de los desafíos de la coordinación de servicios públicos fuera del sitio y los vínculos, nuestros equipos completaron con éxito el proyecto a tiempo y dentro del presupuesto para nuestro cliente.